Layout optimizer. Everything runs in your browser, and your data stays on your computer.

Find layouts with less forklift travel

Load your machines and flows, press one button, and compare up to five layouts: a full re-layout, an alternative, and quick wins that move only 10, 5 or 2 machines.

1. Your hall

Start with an example, import a DXF drawing, or type your machines into the table below.

“Save project” stores everything in one .hallroute.json file: machines, flows, zones, settings and the layouts you found. “Open project” loads it back.

Hall plan

Drag machines on the plan to place them. To take a machine off the plan, drop it below the hall.

Tip: copy rows from Excel (name, x, y, width, depth) and paste them into the table. Positions are machine centres, measured from the bottom-left corner of the hall. Leave them empty to plan a new hall.

Aisle widths from the vehicle and traffic (ASR A1.8)

Widths follow ASR A1.8: the vehicle or load width plus 0.5 m on each side, or 0.75 m where people walk the same route. Two-way routes need room for a second vehicle plus 0.4 m between them. Allow extra width at bends and crossings.

Time and money (optional): forklift hours, savings and payback

Forklift hours are the distance driven (doubled if the forklift returns empty) divided by the speed, plus the time to pick up and set down each load. With a cost per forklift hour, savings come from the hours saved. Without it, they come from the cost per km. The cost to move a machine covers dismantling, transport, reconnection and downtime.

Usually 5–40 seconds. Halls with over 100 machines take 1–2 minutes.

What is missing or could be better?

Tell us what you tried to do, what was unclear or what you would need. We read every message.